Skip to content

Operations

Generate risk register PDFs from your data

A risk register earns its keep at the review meeting: every open risk scored after controls, with an owner, a treatment and a date — and the ones above appetite impossible to miss.

3 designs, each a separate take on the same document rather than a recolour of one layout: Minimal, type-led, Swiss grid and Card-grid dashboard. Every preview below is the actual compiled output, not a mock-up.

Open one in the editor and render it from your own JSON over the API — 1 page of A4 portrait and A4 landscape, the same engine either way.

Designs
3
Page size
A4 portrait and A4 landscape
Length
1 page
Document family
Analytical report

Risk register designs

How the risk register designs differ

Same document, same data model, 3 different arguments about how it should look on paper. Pick on layout and typography — the content behaves identically.

Design Layout Palette Typefaces Pages
Audit Ledger Minimal, type-led Ochre & ink Merriweather + Open Sans 1 · A4 portrait
Controls Grid Swiss grid Cobalt & chartreuse Inter only 1 · A4 portrait
Heat Matrix Card-grid dashboard Oxblood & bone Montserrat + Lato 1 · A4 landscape

What your data drives in a risk register

Each design is authored against an explicit reflow contract, so it is defined up front which blocks are emitted once per record and which fields absorb longer content. That is what stops the layout falling apart at a hundred rows.

Design Repeats per record Grows with your data
Audit Ledger ledger entries; the score cells; the closed-risk rows every entry's exposure and treatment; the scoring note; the closing paragraph
Controls Grid control rows; the four summary cells; gap rows every control's description and finding; the scope note; the conclusion
Heat Matrix summary cards; matrix cells; register rows; the movement list every register row's risk and mitigation; the appetite note

Start from one of these risk register designs

Open a design in the editor and the agent reshapes it around your schema — then render it from your own data over the API, or let your users edit it in the embedded editor.