Skip to content

Project status template

Milestone Rail

Side rail · Teal & coral · Merriweather + Inter

The full document

Download the compiled PDF
Milestone Rail — project status template, Side rail layout, rendered from live data

Rendered by the same engine the API runs — this is the compiled output, not a mock-up.

What happens when your data replaces the sample

What Milestone Rail does when the data is longer, shorter or emptier than the sample:

Fixed page furnitureNever grows, never moves
full-height teal rail carrying the project block, the dates, the team and the distribution list (fixed height — nothing in it may grow); foot rule across the main column
Repeats per recordOne block per row of your data
milestone rows; risk rows; the progress list
Grows with your dataAbsorbs long values without breaking
the headline paragraph; milestone notes; risk mitigations; the closing ask
Pinned to every pageHolds position across page breaks
the rail spans the full page height and the foot rule sits at the page bottom on every page
Order on the pageWhat sits after what
the milestone table after the headline; risks after the milestones; the ask last
Page breaksWhat may split, what must not
the milestone and risk tables may split across pages; the ask panel must not
Last pageHow the document ends
risks and the ask may occupy the final page alone; the rail and foot rule carry it

Palette and type

Teal & coral

  • Ink #0f3d3e
  • Accent #e07a5f
  • Canvas #f2efe8

Merriweather + Inter

The pairing this design was drawn around, laid out as a Side rail on A4 portrait. Either face can be swapped in the editor — the layout holds on the grid, not on a font's metrics.

Other project status designs

All project status templates →

Milestone Rail is the side rail reading of this document; its siblings take it differently — editorial serif, card-grid dashboard and minimal, type-led. See all project status templates.